1. | From the Menu Bar, select LoadCase > Monitored Volume > Create / Modify. |
2. | Select the type of monitored volume to create by clicking Select a type. |
3. | Enter a name in the field next to Select a type. |
4. | Select the Properties sub-tab (available for any monitored volumes type), select monitored volumes using one of the following methods: |
Button
|
Behavior
|

|
pick elements in the graphic window
|

|
add/remove element by ellipse selection
|

|
add elements by box selection
|

|
remove elements by box selection
|

|
pick parts in the graphic window
|

|
add parts by box selection
|

|
remove parts by box selection
|

|
add the parts selected in the tree
|

|
remove the parts selected in the tree
|

|
clean the parts selected in the tree
|
5. | After making a selection, answer the question in the Dialog menu bar with Yes or Cancel. |
Note:
• | The default box is rectangular. Use the SHIFT key to define a polygon box. |
• | A surface must be selected before any vent hole, injector, or bag can be created. |
6. | Set the necessary values in the different fields which are under the surface selection. |
7. | Select the Vent Holes sub-folder (available for GAS, AIRBAG and COMMU monitored volumes): |
8. | Click to create a new vent hole. |
9. | Select Located surface to define a vent hole in a specific area of the monitored volume surface. |
10. | After making a selection, answer the question in the Dialog menu bar with Yes or Cancel. |
11. | Select unlocated surface to defined a generic vent hole. |
12. | Set the necessary values in the different fields which are under the surface selection. |
• | Por. vs Time = porosity versus time |
• | Por. vs Pressure = porosity versus pressure |
• | Por. vs Area = porosity versus area |
14. | Click Save to save the vent hole. |
or
Click Cancel to cancel the vent hole creation.
Note: | If the new vent hole is incorrect, HyperCrash will indicate this and request correction of the errors. |
• | To modify a created vent hole, select the vent hole (only one) in the window list. |
- | Click to see the vent hole and edit it |
- | Modify the vent hole as defined in the creation phase |
• | To delete created vent holes, select the vent hole(s) in the window list. |
- | Click to view the vent hole(s) |
- | Click to delete the vent hole(s) |
15. | Select the Injectors sub-folder (available for AIRBAG and COMMU monitored volumes): |
16. | Click to create a new injector. |
17. | Set the necessary values in the different fields which are under the surface selection. |
• | Mass of inj. vs. Time = mass of injected gas versus time |
• | Temp. vs. time = temperature of injected gas versus pressure |
• | P(t) = pressure versus time |
• | P(theta) = pressure versus angle |
• | P() = pressure versus distance |
19. | Select the type of mass input: |
• | Mass versus time: toggle button switched off. |
• | Mass flow versus time: toggle button switched on. |
• | Toggle the button, Jetting ON / OFF. |
• | Define the local skew of the jetting by clicking and selecting three nodes on the screen. |
• | Define the function P(t) = pressure versus time. |
• | Define the function P(theta) = pressure versus angle. |
• | Define the function P() = pressure versus distance. |
21. | Click Save to save the injector. |
or
Click Cancel to cancel the injector creation.
Note: | If the new injector is incorrect, HyperCrash will indicate this and request correction of the errors. |
• | To modify a created injector, select the injector (only one) in the window list. |
- | Click to view the injector and edit it. |
- | Modify the vent as defined in the creation phase. |
• | To delete created injectors, select the injector(s) in the window list. |
- | Click to view the injector(s). |
- | Click to delete the injector(s). |
22. | Select the Bags sub-folder (available for COMMU monitored volumes): |
23. | Click to create a new bags communication area between bags. |
24. | Select the monitored volume from the monitored volumes list (type: AIRBAGS or COMMU) which will communicate with the edited one. |
25. | Click Select in order to validate the monitored volume selection. |
The common surface between the bags is automatically highlighted.
26. | Use the following functions listed above in Step 4 to modify the communication surface. |
27. | After making a selection, answer the question in the Dialog menu bar with Yes or Cancel. |
28. | Set the necessary values in the different fields which are under the communication surface selection. |
29. | Click Save to save the communication surface; or |
Click Cancel to cancel the communication surface creation.
Note: | If the new vent hole is incorrect, HyperCrash will indicate this and request correction of the errors. |
30. | Select the bag (only one) from the window list. |
31. | Click to view the bag and edit it. |
32. | Modify the bag as defined in the creation phase. |
- | Select the vent bag(s) in the window list. |
- | Click to view the bag(s). |
- | Click to delete the bag(s). |
Save a Monitored volume
When finished creating and modifying vent holes, injectors and bags:
1. | Click Save to save the created or modified monitored volume. Answer the different questions in the Dialog menu bar about the results of the different checks (Yes or Cancel). |
or
Click Cancel to cancel monitored volume creation or modification.
2. | Click Close to close monitored volume menu. |
The creation and modification pages for the monitored volumes are the same.
Go to
Monitored Volume